Skip to main content
PHOTOS

THESE ARE SOME OF THE RECENT PHOTOS OF PROJECTS I HAVE WORKED ON.

FALL 2023 POOL HEATER SHED 

2023 WORK

Install Solid showerpan and Soild walls with corner molding, and solid shower walls over tub, in Hurst TX, 

Demo cast Iron tub, install shower pan, shower walls, trim surround shower and expand and install new bath door, Greenville TX

For https://1dayshower.com

2022 WINTER WORK

Remodel Bathroom, install new shower, window, vanity, flooring, paint and trim

2022 FALL WORK Room converted to office

Install new window, T&G wood installed on ceiling and walls, flooring, painting doors, door panels, and install new shower, and vanity, install water closet and lighting.

2022 WORK

REMODEL OFFICE UNITS: REPLACE WINDOWS, WAINSCOT AND TRIM, TRIM WINDOWS, REPAIR DOORS, PAINTING,  FLOORING AND TRIM

SUMMER 2020 MULHERON RESIDENCE, remove stucco siding on gables and install white vinyl trim and architectural siding

Spring 2020 Canandaigua Country Club office, Paneled walls, door, trim, flooring and cabinets

new tub and floor in a bathroom

2019 WORK 

CORDARO RESIDENCE FALL 2018: Remove old mantle and install two new manufactured mantles

SWANSON RESIDENCE FALL 2018: remove rotted trim on barn garage doors and replace with vinyl trim

BROPHY RESIDENCE, SUMMER 2018: Install vinyl cupola on roof

LAKEWOOD MEADOWS PAVILION, MAY 2018: remove old trim and siding and install new trim, siding, aluminum fascia and painting

GREGORIO KITCHEN OCT 2017: remove cabinets, install new window, remove soffit and drywall ceiling for new cabinets. Install backsplash

HANSEN DOOR PANEL Oct 2017: Panel and molding above door

RUFFALO DECK ROOF, OCT 2017: Add roof over existing deck

CAIN Sept 2017 basement glass blocks 

GRAMMATICO:2016-2017 structural solutions ( beam in kitchen area above ceiling, beam in garage to remove sagging, repair sagging trusses), framing, insulation, cabinets, painting, interior doors and trim, laminate floor, and ceramic tile floor

MISCELLANEOUS:

ENGLERT RESIDENCE, SUMMER 2017:​  Install two transom windows

VANDERHOOF ADDITION, SPRING 2016: Side addition, upper addition (master bedroom and bath), Contractor services,  demolition, saving of T&G trim, framing of beams, walls, trusses, ceiling, and sheathing, Roofing, Siding, new windows, Interior doors, trim and install of old and new T&G trim, insulation, remodel of bathroom 

NAPLES TOWNHOME, SPRING 2015: Roof repair, drywall ceiling repair, paint ceilings, walls, doors and trim. Remove kitchen and install new cabinets. install new 6 panel doors, remove old and install new ceramic tile around fireplace, install vinyl laminate flooring and electrical lighting.

COSAD RESIDENCE: SUMMER 2015, Pool Deck, stairs, self-closing gate.

FREIERT RESIDENCE: FEBRUARY 2015 Install Ceramic tile in Hallway, Laundry Rm., PDR, and Master Bedroom.

VANDERHOOF RESIDENCE: WINTER 2014; DEMO LOW CEILING, FRAME BEAM TO SUPPORT SECOND FLOOR, FRAME CEILING, AND WALLS FOR LAUNDRY, ELECTRICAL, PLUMBING, INSULATE, DRYWALL AND FINISH, LEVEL FLOORS, INSTALL CABINETS AND COUNTERTOPS.

RUSSELL RESIDENCE FALL 2013: FRAME ADDITION, REMOVE OLD PORCH, SIDING, ROOFING, INSULATION.

ENGLERT RESIDENCE: SEPT 2013: MOVE WINDOW, FRAME AND INSTALL PATIO DOOR, REMOVE OLD DECK and FRAME IN NEW NEXT TO OLD. FRAME ANOTHER DECK to DECK, REPLACE DECKING ON OLD DECK AND REPAIR FRONT STEPS

MAYNARD RESIDENCE: AUG 2013 LEVEL KITCHEN FLOOR, INSTALL KITCHEN CABINETS, DRYWALL, INSTALL EXTERIOR DOOR, REPAIR SIDING, i NSTALL ELECTRIC FLOOR HEAT, INSTALL CERAMIC TILE ON FLOOR AND AT COUNTERTOP BACKSPLASH

NAPLES PROJECT: JUNE 2013, REPAIR DAMAGED SEWER LINES, PRIME AND PAINTED WALLS AND TRIM OF INTERIOR AND PAINTED PORCH. INSTALLED OUTDOOR INDOOR CARPET. REMOVE OLD COUNTERTOPS AND MADE NEW LAMINATE COUNTERTOPS.

PRICE RESIDENCE: JUNE 2013, INSTALL PANELS  AT COUNTERTOP WALLS AND CERAMIC TILE IN BATHROOMS

TESTA DECK: MAY 2013, I ASSISTED THE HOMEOWNER TO BUILD THE DECK HE WANTED, FRAMED, INSTALLED POST, FRAMED STAIRS AND INSTALLED STAIR RAILING

FITZPATRICK PAVILION: MAY 2013

CLARK RESIDENCE ROCHESTER N.Y.MARCH 2013: REMOVE OLD KITCHEN CABINETS, INSTALLED NEW KITCHEN CABINETS, NOT THE OCUNTERTOPS AND PAINTING
CLARK RESIDENCE, DAVENPORT FLORIDA FEBRUARY 2013: REMOVE OLD WINDOWS AND SIDING, INSTALL NEW WINDOWS, J-CHANNEL WINDOWS AND REINSTALL SIDING.
CLARK RESIDENCE FEB 2013 FLORIDA: DEMO BATHROOM: WALLS, TUB, VANITY AND FLOORING. INSTALL NEW TUB, SHOWERVALVE, DRYWALL WALLS, TAPE AND SAND, INSTALL BACKER BOARD FOR TILE WALLS, TILE SHOWER, TILE FLOOR, INSTALL TOILET, AND VANITY. INSTALLED BATH FAN, VANITY LIGHT, MIRROR, VANITY CABINET, COUNTERTOP, FAUCET, PLUMBING AND ELECTRICAL OUTLET AND SWITCHES.
COSAD RESIDENCE: DEC 2012 REMOVE OLD UNSAFE STAIRS AND INSTALL NEW SET OF STAIRS WITH FRAMING, DRYWALL AND TWO NEW RAILINGS.

BRIGGS KITCHEN NOV 2012: REMOVE OLD STOVE, MODIFY CABINETS AND INSTALL NEW STOVE.

PATERAS POOL HOUSE DEC 2012: FRAME, ROOFING, AND SIDING OF POOL HOUSE
CLARK CONSTRUCTION PALMYRA ADDITION NOV 2012: REMOVE DECK, FRAME ADDITION,
CLARK CONSTRUCTION: AUSTIN RESIDENCE: SEPT/OCTOBER 2012 DEMO KITCHEN, DEMO WALLS AND INSTALL KITCHEN CABINETS, REMOVE KITCHEN WINDOW AND INSTALL NEW, INSTALL POWDER ROOM CERAMIC FLOOR, AND BUILD OVER EXISTING PAINTED MANTLE WITH LAMINATE FLOORING.
CLARK CONSTRUCTION HONEOYE LAKE PORCH RESTORATION SEPT 2012
Day one thru day three

DAY FOUR THROUGH SEVEN

DAY EIGHT AND NINE

DAYS TEN THRU TWELVE

NAPLES RENTAL HOME: SEPT 2012, REMOVE OLD DECK AND INSTALL A NEW DECK. INCLUDING REMOVAL OF ROTTEN SILL, MAKE AND INSTALL NEW AND REPLACE ROTTED SIDING.

CARGES CONESUS RESIDENCE: SEPT 2012 REMOVE BATH VANITY AND TOP, AND OLD TOILETS. MAKE NEW VANITY TOP AND INSTALL NEW VANITY BOWL AND FAUCET, INSTALL NEW TOILETS AND INSTALL NEW VINYL TILE FLOORING IN BOTH BATHROOMS
CLARK CONSTRUCTION: WARDS ADDITION, AUGUST 2012: FRAMING, SIDING,STAIRS, ACCESS DOOR, SOME INTERIOR TRIM.

SANDS RESIDENCE: BUILD RAMP, REPAIR SCREENS AND REPAIR PATIO DOOR. AUGUST 2012

JC CONSTRUCTION: CARNEY RESIDENCE: Framing and Siding of Addition. August 2012

VANDERHOOF COTTAGE BARN: STAIN EXTERIOR JUNE 2012

RUSSELL RESIDENCE: TREE FORT JUNE 2012
KEUKA LAKE, JOE CRANE CONTRACTOR, MAY 2012: Support ceiling, remove wall add beam, install beam at kitchen, cut open floor, repair foundation where soil collasped and fireplace footer broke. make new footer for fireplace. Remove door and window, enlareg window opening for new 12' slider and shrink door opening for window. Install window and door.

PONTARELLA RESIDENCE, CLARK CONSTRUCTION, May 2012: Remove decking, surround and stairs and install new surround, decking, stairs and railing.

Skrypek Residence, Bristol Harbour, Canandaigua, N.Y. Spring 2012: Remodeling of Condominium, Removal of old kitchen and bedroom and hall for the condo was not practical for the kitchen was at the entry and was 3X as big as the bedroom and there was a hall between bathroom and bedroom making bedroom 6'x11'. Install 2x4's on ceiling to make smooth covering Spancrete panels. build walls for bedroom and install framing for pocket doors, bifolds and frame pocket door to bathroom. Installation of plumbing for new kitchen, electrical installed for new kitchen, lights installed in ceiling throughout unit, and electric panel moved. drywall ceiling and walls, painting bath and showertile and new bath fixtures by owner. Installed doors, trim, laminate flooring (flashed bad spots on floor for laminate), and kitchen cabinets, countertops supplied and installed by others.
Cordaro residence April 2012: Repair of deck and new railing system, remove rotted posts, install on new 6x6 post on concrete pads with post plates, replace damaged decking, level railing posts and replace railing system with new design, repair stairs and secure to post. Remove basement windows and install glass blocks
Clark Construction, East Lake Road, Canandaigua, N.Y. 2012: Frame Addition, floor, walls, roof, saddle, and tray ceiling. Trim and siding pictures coming soon

RUSSELL TOWNHOME REMODEL: built walls, insulate, install two used doors, trim, drywall and paint in 2011, then remodeled upstairs 2012 and added hall to garage to storage with window slits. Removed carpets and damaged tile floors, installed new ceramic tile in bath and laundry room, installed Pergo flooring through living room, kitchen, hall, new hall and stair landing, repaired where fireplace was changed from wood to gas, and designed and built oak mantle. Painted entry door, doors, windows, walls and trim and urethaned cabinets and railing and stained and urethaned new mantle and chair rail. Built hall way to storage with insulated floor and walls, firerated drywall, added lights and heat run. Removed door to garage made drywall opening, moved firedoor to storage, and installed new six panel door and six panel firedoor and cut in window slits from stairway to hall with oak caps. Installed drywall ceiling in storage area, trim beamed and post and installed drop ceiling.

BEFORE in 2011

RUSSELL TOWN HOME FINISHED 2012
Andrew Clark Construction Mueller Garage, Auburn N.Y.: Painting, install interior doors and Hollow metal window frames with glass and trim and build counter.
Clark Residence, Orlando, Florida: remove storm door and install new enty door with window and screen making it look like it has never been changed.

Andrew Clark Construction, Fritz Residence Perinton, N.Y.: Remove cabinets, soffit, repairs to wall and ceiling, install new cabinets, remove wall and add new cabinets and make rolling island, no painting, flooring or countertops. installation of new faucet and garbage disposal, hooking up dishwasher and installing Microwave.

Cutri Construction, Stark residence: Remove windows and doors on deck and install new windows, doors, trim exterior and interior and siding. reframing  and drywall was involved in the work.
Andrew Clark Construction: remove and rebuild barn doors
CLARK SIDING, TRIM, SHED, FENCE AND DECK
CLARK CEILING REPAIRS, this ceiling needed a beam to carry ceiling because walls were removed to make home more open.

SPILLANE TRIM, RAILING AND FLOOR, an thrid floor was added to home. I installed doors and trim, laminate flooring and installed new railing, plus modified old raling into addition.

SPILLANE MANTEL AND DOOR: fireplace was added at addition and needed a mantle and marble hearth. front door was removed and new installed.

DECK STAIRS: removed old stairs falling apart and made and installed new stairs plus railing repairs

RUSSELL DECK: I installed the original deck years before with wrapped around stairs down to ground, a year ago I cut off one side of stairs and made a small deck, with doors on front of deck which allows for storage of lake products. this deck is made of treated and mahogany decking.

RUSSELL REMODEL: the work performed here on second floor was tongue and groove and molding in Master bedroom, interior doors with custom made trim, remove bedroom make Walk in Closet, move a closet into old bedroom, making bedroom larger, install a small bathroom with shower, commode and custom vanity (old furniture cabinet, cut down and install sink,) plumbing, electrical light, suntunnel, laminate flooring, and painting.

first floor work was jack up ceiling, install beams and post to carry second floor, level ceiling, drywall, door, trim and crown molding, level first floor for hardwood flooring.

also painted exterior of home

LEHMAN: walls had to be cut into to insert a recessed trim panel for a fossil with bracket and another wall to have blocking installed for brackets for another fossil all while protecting the Koi fish from the dust

ERWIN BRICK STEPS AND WINDOW: existing step were falling apart and needed to be taken apart and put back together remove and install new windows with new trim and stain.

DIBUO: frost was dismantling this block wall, dismantled the block wall, reinstalled the wall with rebar vertically and horizontally and filled cores solid, with install of oly to wick the water down the block wall.
Cutri Construction Pontarella Residence: remove old walls, tub and drop ceiling, install new sliding door, install bathroom: cutting concrete for plumbing with sewer pump, build walls, insulate, drywall and paint, door and trim and base, Ceramic tile floor and shower and installed drop ceiling

NEW STAIRS: remove deteriorated stairs and railing and build and install new and rebuild railing

Tim McKenna Construction: Cabinets and Oak Trim

JOSS SUNROOM: remove window and install door, dig holes build deck and side walls for trim & siding, sunroom provided by others, reside, drywall exterior wall, install hardwood floor.
Cutri Construction Wades Residence: remove old entry door, storm door and fire door and install new doors and trim
NAPLE HOME AND TOWNHOMES: remove and replace windows, trim exterior and interior and paint trim

JOHN MARCUS

2714 Washington St. PMB 177

Greenville TX 75401
Phone: 903-441-5811